Great Ormond Street Hospital, Bloomsbury, London
DATE: May, 2016As part of the project, a permanent steel intensive basement was created from a 240-linear metre perimeter of 16.5m-18.0m long L606 Steel Sheet Piles.
Deliveries were staggered over a 12-week period at the clients request due to tight access on site. Maxx Piling stored these Piles for the client and were able to respond quickly when required.