Arthur Street, Bank Station Redevelopment, London
DATE: September, 2016These works involved the installation of an 11m x 6.8m Sheet Piled cofferdam to facilitate the excavation to a depth of 13m to commence a shaft construction to access the existing tunnel structure.
Piles were sent from Maxx Piling’s depot in Dordrecht where sealant was applied prior to loading.