V&A Museum, Dundee
DATE: January, 2018Maxx Piling supplied over 450 tonnes of U and Z Steel Sheet Piling on behalf of BAM Nuttall for the temporary double walled cofferdam at the mouth of the River…
Maxx Piling supplied over 450 tonnes of U and Z Steel Sheet Piling on behalf of BAM Nuttall for the temporary double walled cofferdam at the mouth of the River…
Maxx Piling supplied almost 330 tonne of Larssen Steel Sheet Piling to support the construction work being completed at the Prince Charles Wharf Extension at Dundee Port from February 2017….
These works involved the installation of an 11m x 6.8m Sheet Piled cofferdam to facilitate the excavation to a depth of 13m to commence a shaft construction to access the…
As part of the project, a permanent steel intensive basement was created from a 240-linear metre perimeter of 16.5m-18.0m long L606 Steel Sheet Piles. Deliveries were staggered over a 12-week…
Maxx Piling supplied 70 tonnes of Steel Sheet Piles to Network Rail for their emergency reinforcement works at Dover Sea Wall. After severe weather left cracks in a sea wall…
Maxx Piling supplied 337no L606s at 12.00m in length to Carillion for the construction of a basement structure in Kings Cross. The first 100 Piles were supplied from stock with…
Maxx Piling supplied over 46 tonnes of Steel Sheet Piling on behalf of Kier for their temporary works cofferdam on the River Exe. These works were required to construct a…
Maxx Piling supplied 87 tonnes of L604 Steel Sheet Piles to the Hythe Quay. These essential works began in 2015 to rebuild the historic quay in Maldon, which had partially…
Maxx Piling supplied over 500 tonnes of Steel Sheet Piles to Geoffrey Osborne for the repair scheme at Botley landslip. After torrential rainfall, an embankment gave way between Eastleigh and…